An opening in the wrong place is cheap now and expensive later
Checking a width while the blockwork is still going up is a different conversation from finding it at second fix.
Fifteen seconds of drone footage outside and a thirty-three second phone walk inside, built into one record somebody can move through and take dimensions off. Our own demonstration on stock footage, made to answer one question: can the two kinds of footage a site already produces be combined into something measurable.

Sites already produce footage. A drone goes up for the monthly progress shot and somebody walks the floors with a phone when a question comes up. Both end as video nobody can measure, in two different folders, describing the same building.
A building under construction is the hardest kind of place to ask a question about. It changes weekly, most of it is not safe to wander, and the people who need answers are usually not on site. The footage already exists; what is missing is a way to measure it and put it in one place.
Checking a width while the blockwork is still going up is a different conversation from finding it at second fix.
The envelope can look finished with the interior barely started, which is exactly when reporting and reality drift apart.
For a question that takes thirty seconds to answer once somebody is standing in the right place.
Which is the real test here: this used a short drone pass and a phone walk, both of which a site already does.
The outside and the inside of the same building, reachable from each other, from footage that already existed.
The blockwork is the ruler: six courses should be 1.50 m, and the model reads 1.48.
Fifteen items placed in the 3D rather than listed in a document, with what was counted in the footage beside them.
Thirty-three seconds of it, and fifteen seconds of drone.
Each of these is somebody deciding with a dimension in front of them rather than a photograph. None is settled by the software, and the measurements carry the margins below.
Every figure on this page says what kind of figure it is. That is the whole of why it can be used.



The readings below are software looking at footage. Each is an estimate for an engineer or a site manager to confirm on the ground, and none of them is a finding.
The inside and the outside are separate reconstructions, joined at the entrance, and they are scaled from different references: the blockwork inside at about three per cent and a lorry in the yard outside at about five. A dimension from one does not inherit the other’s margin.
Scaled from objects of known size, with no survey control anywhere in the job.
The plan is drawn from one walk. What the camera did not see is not on it.
Statuses and counts are estimates from footage, to be checked on site, and the trade percentages are samples.
Three per cent inside and five outside is good enough to check an opening and plan a visit. It is not good enough to set anything out.
Nothing here was compared against a site visit or a survey, so there is no figure for what it saves.
Built on stock footage, as our own demonstration. Nobody commissioned it: it exists to show what the method does on a working industrial site rather than on a tidy one. The site and its operator are not named here and are not ours to name.
The building itself. Six courses of aerated block should measure 1.50 m, and the 3D reads 1.48. That is the reference everything inside rests on, and it is why the inside figures carry about three per cent and the outside about five. There was no design sheet in this job and nothing here is compared against one.
Not as though it carried the same confidence. The outside and the inside were captured separately and are scaled from different references: the blockwork inside, at about three per cent, and an articulated lorry in the yard outside, at about five. They are brought into one frame and behave as one record to move through, and a dimension from one does not inherit the other’s margin.
No. It is drawn from one walk, so rooms the camera only glimpsed are patchy and rooms it never entered are not there. It is a plan drawn from the walk, which is a useful thing and not a surveyed one.
Software read the footage and assigned the statuses, and they are on the page as estimates to be checked on site. The trade percentages in the demonstration are sample figures rather than measurements, and the panel says so on screen.
Because nothing to do with services appears anywhere on that walk. The honest reading of a zero there is that the camera did not see any, not that none has been done. We left it visible rather than hiding a number that needs explaining.
About three per cent inside and five per cent outside, because scale comes from objects of known size rather than from survey control. Every reading in the demonstration also carries a high, medium or low rating with a margin in centimetres beside it. Where a surveyed figure exists, the surveyed figure wins.
Stock footage of an unnamed site. The worker in the opening shot is blurred, as is every brand and logo. Nothing here implies a connection with the building or whoever is putting it up.
A short drone pass and somebody walking the floors with a phone, which most sites already do. Something of known size in frame helps the scale, and ground control would tighten it further than either.
Tell us what you already film and what you need to know. We will say whether this would answer it, including when it would not.